Peterborough County
James A Gifford Causeway & Chemong Bridge Rehabilitation
Structural Rehabilitation: including staged construction, superstructure jacking and bearing replacement, 150m3 of concrete removal (Type A, B, C), 140m of overhang access assembled, 180m3 of structural concrete placed, Enbridge Gas Main Protection, waterproofing and paving.
Electrical Works: 2840m of electrical conduit placed, 13 ground mounted street luminaires, navigational lights.
Roadworks: 4400m2 of Asphalt Pulverization and Reclamation, 1760t of rock fill for road widening, 1600m3 of earth excavation, 3500t of granular placement, 1845t of asphalt, 700m of steel beam guide rail.