Centre Wellington
Bridge 16WG Replacement
Bridge structure replacement, including but not limited to; environmental protection measures, waterway access barges with debris and slurry containment, removal of existing railings, utilities, roadway appurtenances and existing concrete arch culvert. Furthermore, installation of shoring / cofferdam, excavations and unwatering for construction of spread footings, bridge abutments and wingwalls. Embankment remediations and streambed protection, structural backfill and compaction, hoisting & rigging and install of newly supplied box girders, bridge deck and overhang construction, earth excavation for new roadway, backfill, and road base grading and compaction, mew architectural parapet wall construction and SBGR install, waterproofing and paving, remediation of nearby private accesses and seed, topsoil, and general site restoration.